Blueprints for Success: A Construction Community Outreach Event
Date: Tuesday, March 31, 2026
Time: 10:00 am - 1:30 pm ET
Location: Albany Capital Center | 55 Eagle Street | Albany, NY 12207
Upcoming Bid Packages:
The Life Sciences Public Health Laboratory project will provide multiple opportunities for participation in the project. The schedule below is a guide to the timing of procurement activities. This page will be updated with actual bid dates when available.
Bid Release #1 – September 9, 2024
Design Assist RFQ
23A HVAC Wet Central Utility Plant (CUP)/ Core and Shell (C&S) - Part A
23C HVAC Dry Central Utility Plant (CUP)/ Core and Shell (C&S) - Part A
26A Electrical Central Utility Plant (CUP)/ Core and Shell (C&S) - Part A
22A Plumbing Central Utility Plant (CUP)/ Core and Shell (C&S) - Part A
23E Controls
Bid Release #2 – December 2024
26D Electrical UG to OGS Substation
31A Mass Excavation
33A Site Utilities
26C SB - Emergency Generators
26G SB - Emergency Electrical
Equipment
26H SB - Normal Electrical Equipment
23I SB/xPL - Modular Air Source Heat Pump (ASHP) Platform
Bid Release #3 – May 2025
05A Structural Steel
08C Exterior Glazing
08D Exterior Metal Panel
14A Elevator
03A Concrete Foundations & SOG
07D Fire Proofing
03B Concrete SOMD & Fill at Stairs
07C Waterproofing
11B Window Washing Equipment - VOID
Bid Release #4 – October 2025
03C Precast Wall Panels - VOID
04A Masonry
05B Exterior Backup Wall/Sheathing
07A Roofing
22A Plumbing Underground
23F.1 SB/xPL - HVAC Equipment - ASHP/ACC
23F.2 SB/xPL - HVAC Equipment - AHU/HRU/Humidifier Pumps
23F.4 SB/xPL - HVAC Equipment - HVAC Fans & VFDs
23F.5 SB/xPL - HVAC Equipment - Boilers
23F.6 SB/xPL - HVAC Equipment - Clean Steam Generators

Bid Release #5 – March 2026
05C Miscellaneous Metals
06A Millwork and Casework
07F Firestopping
08B Interior Glazing
08E Demountable Partitions
09A Framing and Drywall Core and Shell
09B Framing and Drywall Interior Fit-out
09C Acoustical Ceiling
10A FRP Wall and Ceiling Panels
11A Residential and Foodservice Equipment
11D SB - Lab Equipment Bio Safety Cabinets
11F SB - Lab Equipment Autoclaves
12B SB - Laboratory Casework / Lab Equipment Fume Hoods
21A Fire Protection
22B SW&V (Core and Shell and Fit-out)
22C Storm (Traditional and Siphonic)
22D Domestic Water (Core and Shell and Fit-out)
22E Lab Gases (Core and Shell and Fit-out)
22F RODI (Core and Shell and Fit-out)
22G Plumbing Heat Pump
23B HVAC Wet Fit-out
23D HVAC Dry Fit-out
23J SB/xPL - Air Terminal
26B Electrical Program Fit-out
26E Exterior Lighting and Controls
26J SB - Light Fixtures (Furnish Only)
27A Tel/Data (Core and Shell and Fit-out)
28A Security and Fire Alarm, AV and Access Controls
Bid Release #6 – June 2026
08A Doors/Frames/Hardware
08D Overhead Coiling Doors - VOID
13A Radiation Shielding -VOID
09D Flooring - VCT, Carpet, Resilient
09E Painting & Wallcovering
09F Resinous Flooring
09G Epoxy Terrazzo
09H Ceramic Tile
10B Interior Signage
10C Interior Specialties
10D Wall & Door Protection
32A Exterior Improvements
12A Window Treatment
26F Site Power / Exterior Lighting & Controls Install | Charging Stations F&I
GC/GR Packages
GC09 Security Cameras
GC10 Site Camera – Timelapse
GC12 Construction Progress Photos
GC17 Equipment Rental
GC18 Final Cleaning
GC26 Owner Video Training
Prequalification Process for the Life Sciences Public Health Laboratory
*All 2nd Tier subcontractors and suppliers are not required to submit prequalification information.
Prime/Tier-1 Contractors will be selected to participate in the prequalification process from the businesses submitting the Contractor Interest Form. Prime/Tier 1 contractors will be required to be prequalified to submit a proposal.